2,5 MW Coal and Biomass Power Plant - ST152

FOB Reference Price:Get Latest Price
EUR 1,450,000 / Unit | 1 Unit/Units (Min. Order)
Port:
Germany
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Germany
Brand Name:
Siemens
Model Number:
KKK
Packaging & Delivery
Packaging Details
Dismantling, marking, packing, transport, installation and commissioning can be done by TUBA Turbine in co operation with the manufacturers. Warranty for operation and sercive contract.
Delivery Time
immediately from our warehouse

Ref.-Nr. ST 152

 

65bar / 480°C

 

This power plant was built up to supply the paper mill with steam and electricity.
The main demand in a paper mill is steam which is need for drying the paper in many sections. The steam consumption in this papermill was ca. 16 to / hour.
In fact of this situation, that you need a lot of steam for manufacture the paper, this energy in the steam was used to produce the electricity.

In 2002 a new project was started to overhaul the complete power plant.
This meant that really everything were made new or were overhauled in this power plant. After finishing this overhauling the papermill went in insolvency and after this, there was no use for the steam anymore. Without using the steam, this system is complete uneffective.